The gas collecting and utilisation system in Izmir was extended to 28 MW(el) during the year 2021.
Start of a new l ...
planning » landfill planning services » waste deposition and waste pouring concepts
Customised pouring concepts are not only of high relevance for an appropriate and cost-optimised placement of waste, but also of decisive relevance for the organic conversion, in order to optimise the gas generation process. Simply said, while positioning the waste you are already deciding whether the gas generation process and collection will be supported, inhibited or made nearly impossible. Besides the optimisation of transport routes, water drainage, deposition structure, especially the deposition capacity, pouring advancement and the „growing“ deposition body shape can be significantly influenced. This reduces in addition, e. g. by optimising the water leakage, the water intake of the deposition body, and the costs for treating the leak water can be reduced.
The gas collecting and utilisation system in Izmir was extended to 28 MW(el) during the year 2021.
Start of a new l ...
Dr. Arnd Seyfert
SEF-Energietechnik GmbH
Lessingstraße 4
D-08058 Zwickau
fon: +49 375 21 193 22
fax: +49 375 21 193-29
seyfert@sef-energietechnik.de