The gas collecting and utilisation system in Izmir was extended to 28 MW(el) during the year 2021.
Start of a new l ...
planning » biomass fermentation and gasification » dry fermentation
As wet fermentation facilities in the area of waste utilisation require an extensive and often highly energy-consuming treatment of the fermentation substrate, dry fermentation facilities are moving more and more into the focus of attention. Dry fermentation facilities are available with different process technologies, the manufacturing of a material mix that is suitable for pumping is however not necessary for any of these procedures. Other than procedures with a pure irrigation of the conditioned percolate over the material substrate, there are also facilities with propulsion shovels and low throughput of material on the market. Thus a continuing material flow can be realised, and the discontinued filling and drawdown do not apply.
The gas collecting and utilisation system in Izmir was extended to 28 MW(el) during the year 2021.
Start of a new l ...
Dr. Arnd Seyfert
SEF-Energietechnik GmbH
Lessingstraße 4
D-08058 Zwickau
fon: +49 375 21 193 22
fax: +49 375 21 193-29
seyfert@sef-energietechnik.de